The fire is out, the trucks are gone, and there is a notice taped to your front door. It says the building is unfit to occupy, that nobody may live in it until the violations are corrected, and that removing the sign is against the law. Most owners read that and assume the house is now stuck — that the city has taken it, or that it cannot be sold until it is rebuilt.
Neither is true. A condemned house in Minneapolis or St. Paul can be sold, and fire-condemned houses change hands every year. But it cannot be sold the way a normal house is, and the two cities run very different rules. This guide explains what the placard actually means, the exact steps each city requires before a condemned house can change hands, how Minneapolis can hold back part of your insurance settlement, and who can realistically buy it. Our guide to selling a fire-damaged house in Minneapolis covers how we buy; this article is about the rules you are working inside.
- Condemnation does not take your title. You still own the house, and you are still responsible for it — nobody, including you, may live in it until it is cleared.
- In Minneapolis, a house flagged “Condemned CC required” cannot be offered for sale at all until you have a code compliance inspection report (the repair orders), with a signed seller’s disclosure attached.
- You do not have to do the repairs. Minneapolis lets you sell as-is with the repair orders, as long as you and the buyer both sign the city’s Acknowledgement of Responsibility, filed within 10 days of closing.
- In St. Paul, a fire-vacated house offered for sale before it is repaired becomes a Category 2 vacant building: no sale without the city’s approval of the buyer’s repair plan and financing.
- Minneapolis is on the state’s fire-escrow list. On a large building claim, your insurer withholds 25% and the city can escrow it until the house is repaired or removed (Minn. Stat. § 65A.50).
What the Placard Actually Means
A condemnation placard is an occupancy order, not a seizure. St. Paul’s Department of Safety and Inspections states it plainly: the owner of a condemned building keeps title and responsibility for it, and condemnation is not the same as a government taking the property under eminent domain. The placard names the department that condemned the building, the date it had to be vacated, an order that it stay vacant until the violations are corrected, and the penalties for removing or defacing the sign. Leave it where it is.
After a fire, a house is usually condemned for one of three reasons: the fire made it structurally unsafe, it is a fire or health hazard, or it has lost basic facilities. That last one catches owners off guard. Both cities treat a building whose utilities are shut off — which often happens after a fire — as unfit to occupy, even if the fire damage itself was limited to one room. Minneapolis also lists utilities being discontinued, and a building sitting vacant and boarded for more than 60 days, among its grounds for condemnation.
The practical effect is the same in both cities: nobody lives there, not even the owner, until the problems are corrected and the city signs off. In Minneapolis that sign-off is a Certificate of Code Compliance.
First, Find Out Exactly What You Are Dealing With
- Minneapolis. Look the address up on the city’s property information search and check the parcel flags. A “Condemned CC required” flag means the house must go through the code compliance process before it can be sold or reoccupied. The city’s Code Compliance / Fire Escrow desk is at (612) 673-5805.
- St. Paul. Call the Department of Safety and Inspections at (651) 266-8989. Ask whether the house has been registered as a vacant building and which category it is in, because the category decides whether and how it can be sold.
- Your insurer. Ask the adjuster whether the building claim is likely to exceed half of your dwelling coverage. If it does and the house is in Minneapolis, part of the settlement may be escrowed (more on that below).
Selling a Condemned House in Minneapolis
Minneapolis has the more rigid process, and the city has written it down in detail. Its condemned-properties page says you cannot buy, sell or work on a condemned building until it has a Certificate of Code Compliance — but its own Truth-in-Sale-of-Housing ordinance (section 248.225) carves out the path most fire owners actually use: an owner may sell a condemned property as-is, provided the disclosure requirements are met. Here is what that means step by step.
1. Order the code compliance inspection before you market the house. The application form says it outright: the property cannot be offered for sale in any way without the code compliance inspection report. You apply to the city’s Construction Code Services with a fee set by the city’s fee schedule, and the city asks you to allow at least two weeks from application to inspection, then at least seven days for the repair orders to be emailed to you.
2. Get the house ready for the inspectors. This is the step fire owners do not expect. The building must be completely cleaned out — furniture, clothing, personal belongings, food and anything unsanitary — and inspectors need access to every area, including the attic, basement, garage and any accessory buildings, through a working lockbox or a representative on site. If the house is not ready, the city will not inspect and charges a re-inspection fee. And if the fire destroyed or the restoration crew removed the furnace or boiler, the application requires proof of asbestos abatement or an air sampling test before the inspection can even be scheduled.
3. Choose: repair it yourself, or sell it with the orders. If you repair, you pull the permits, finish every order, pass the final inspection and receive a Certificate of Code Compliance — which is good for one sale only. If you sell as-is, you hand the buyer a full copy of the code compliance work orders with the city’s Seller’s Disclosure Statement signed and attached, before or at the time of sale. The orders are not valid without the signed statement.
4. Both sides sign the Acknowledgement of Responsibility. On an as-is sale, the seller and buyer each sign the city’s Code Compliance Acknowledgement of Responsibility, and it must be filed with the city within 10 days of closing. That form is where the obligations shift to the buyer, and it is specific about what the buyer takes on:
- arranging and completing every item on the code compliance orders, with licensed contractors and permits;
- a $4,000 deposit, paid by cashier’s check before any permit is pulled;
- finishing all work within nine months of that deposit, with one 90-day extension if the work is half done — or forfeiting the deposit;
- no occupancy by anyone until the Certificate of Code Compliance is issued, and no resale until the orders are complete.
The vacant building program runs alongside all of this. The city notes that condemned buildings often meet its criteria for Vacant Building Registration, and before it issues permits to work on a vacant building the owner must register it and pay all vacant building fees. That annual fee is substantial; our guide to Minneapolis vacant building registration covers the current amount and how it is settled at closing.
Selling a Condemned House in St. Paul
St. Paul handles fire houses through its vacant building ordinance (Chapter 43) and reviews the sale of every registered vacant building. The rules turn on the category the city assigns.
Registration comes first. A condemned house has to be registered with the Department of Safety and Inspections: the registration form, describing your plans to rehabilitate, reoccupy or demolish, is due within 30 days. If the building is vacant because of a fire, the city gives you 90 days to pay the vacant building fee, as long as the form is filed within those 30 days.
The fire exemption ends when you list it. Under the city’s vacant building sale policy, a house that is unoccupied because of fire damage and was vacated or condemned can sit in a “fire exempt” Category 1 while the owner repairs it. But a fire-exempt house is upgraded to Category 2 if it is offered for sale before it is restored to code compliance. For most owners who decide to sell as-is, that is the category that matters.
Category 2: no sale without the city’s approval. Before closing, the seller or the prospective buyer must:
- register or re-register ownership and pay outstanding fees;
- obtain a code compliance report;
- submit a licensed contractor’s cost estimate for the code compliance repairs and a schedule for completing them;
- submit proof of financial capability to cover the purchase and the repairs.
A Truth-in-Sale of Housing report is also required to market a vacant building offered for sale before the code compliance work is done, and there is a fee for the sale review itself. Our Truth-in-Sale of Housing guide explains what that report covers.
Category 3 is the one to avoid. A building the city has declared a nuisance — a dangerous structure, or condemned with conditions that constitute material endangerment — may not be sold at all until it has a Certificate of Occupancy, a Certificate of Code Compliance or a Fire Certificate of Occupancy. Houses drift toward this category by sitting. If you are in St. Paul and leaning toward selling, deciding early keeps you in Category 2, where a sale is a paperwork problem rather than a construction project. Our St. Paul fire-damaged house page covers the vacant building fees.
The Insurance Money: Minneapolis Can Escrow Part of It
Minnesota lets cities opt into a fire-escrow law, Minn. Stat. § 65A.50, and Minneapolis is on the Minnesota Department of Commerce’s list of participating municipalities. (So are several suburbs, including Blaine, Burnsville, Golden Valley, Inver Grove Heights and West St. Paul. St. Paul itself is not on the list as of the Commerce Department’s most recent update.) Where it applies, here is how it works:
- It kicks in only when the final settlement on the building exceeds 49% of the insurance on it. Contents and coverages outside the fire coverage portion, such as additional living expenses, are not counted.
- The insurer withholds 25% of the building’s actual cash value or 25% of the settlement, whichever is less, and notifies you, the city and any mortgagee named on the policy.
- The city has 30 days to claim it, by affidavit that the damaged structure violates health and safety standards. If it does not, the money is paid to you.
- Escrowed money is released to you on reasonable proof that the house has been repaired or replaced, or that the structure and debris have been removed to code — or it can be paid directly to a contractor you have hired to do that work.
- If that proof does not reach the city within 45 days of the escrow, the city uses the money to secure, repair or demolish the structure, and returns anything unused to you. If the mortgage is in default, the first mortgagee can ask the city to release the escrow to pay down the loan.
If you plan to sell, raise the escrow early with your adjuster and the city’s Code Compliance / Fire Escrow desk, and make sure your closer knows about it. It is your money, but its release is tied to the house being repaired or cleared, and after a sale that work is in the buyer’s hands. Our guide to how the insurance claim works when you sell covers the rest of the claim sequence, including why selling does not end a claim already in progress.
Who Can Actually Buy a Condemned House
The rules above narrow the buyer pool sharply. A house nobody may legally occupy is not something most mortgage lenders will fund, and both cities require the buyer to take on real obligations before or at closing: in Minneapolis, the deposit, the nine-month clock and the licensed-contractor requirement; in St. Paul, a contractor estimate, a schedule and proof of funds the city must approve. In practice that leaves cash buyers and experienced rehabbers who have been through the process before.
That affects price as well as speed. A buyer who knows the process prices the repair orders line by line — structural, electrical, smoke and water damage — plus the deposit, the carrying cost and the city timeline. A buyer who does not know it will either walk away after reading the orders or pad the price to cover what they do not understand. Get the orders first, then get more than one written offer. If you are still weighing whether to repair it yourself, our rebuild-or-sell guide walks through the math.
What to Do This Week
- Secure the house. Lock it or have it boarded, and keep the placard in place. A condemned, vacant house draws trespassers and metal thieves, and your policy may limit coverage for a vacant building.
- Get your paperwork together. The placard or condemnation notice, the fire department’s incident report, your policy’s declarations page, and every letter from the adjuster.
- Pull the city status — the Minneapolis parcel flag or the St. Paul vacant building category — and put the St. Paul 30-day registration deadline on your calendar.
- Tell your mortgage servicer in writing. Your lender is named on the insurance check and, in Minneapolis, on any escrow notice.
- Do not start demolition or repairs without permits. Unpermitted work on a condemned house adds orders; it does not remove them.
- Plan the cleanout around the inspection. If the house is full of burned belongings, that is part of the job; our page on selling a house full of belongings explains how we handle contents.
The Short Version
A condemned house is still yours to sell, but the city decides what has to happen first. In Minneapolis, get the code compliance inspection and the repair orders, attach the signed seller’s disclosure, and sell as-is to a buyer who will sign the Acknowledgement of Responsibility — or finish the repairs yourself and sell with a Certificate of Code Compliance. In St. Paul, register within 30 days and expect a Category 2 sale review that the buyer’s plan and funds must satisfy. In either city, move before the house sits long enough to get worse. Our FAQ answers the common questions about how a cash sale works.